MWRD Stickney Mixers

Location

Stickney Water Reclamation Plant

Owner

Metropolitan Water Reclamation District of Greater Chicago

Architect

NA - MWRDGC Engineering

Features

  • Clean 24 aeration tanks
  • Furnish and install 96 large propeller low speed mixers in aeration tanks
  • Provide electrical power, control wiring and equipment
  • Access ramps
  • Structural supports

Description

Remove sludge and clean 24 aeration tanks - each tank @ 435’ x 35’ - 3 batteries with 8 tanks per battery Furnish and install 96 new large propeller low speed mixers in aeration tanks Pass 1 - 4 mixers each in 24 tanks Provide electrical power & control wiring & equipment
Provide complete, integrated and fully functional controls for mixers

Provide access ramps for mixers and structural supports for electrical conduit & panels.