MWRD Stickney Mixers
Location
Stickney Water Reclamation Plant
Owner
Metropolitan Water Reclamation District of Greater Chicago
Architect
NA - MWRDGC Engineering
Features
- Clean 24 aeration tanks
- Furnish and install 96 large propeller low speed mixers in aeration tanks
- Provide electrical power, control wiring and equipment
- Access ramps
- Structural supports
Description
Remove sludge and clean 24 aeration tanks - each tank @ 435’ x 35’ - 3 batteries with 8 tanks per battery Furnish and install 96 new large propeller low speed mixers in aeration tanks Pass 1 - 4 mixers each in 24 tanks Provide electrical power & control wiring & equipment
Provide complete, integrated and fully functional controls for mixers
Provide access ramps for mixers and structural supports for electrical conduit & panels.